
The 2015 News !
This year , almost everything at CLB changes for the better
An outside fitness area will be erected. (pull-ups, Abs and sit-ups ,Weights (pectoral press)
![]() |
![]() |
![]() |
New sports and games will be on offer : Turnball , Disc-Golf , Slackline
![]() |
![]() |
![]() |
A big barbecue is being built on the restaurant’s terrace. from now on in the summers there will be a ‘Barbecue’ evening on top of prior special evenings (Karaoké/Disco , Pizzas)
Insulation and HEATING of a 4 shower-stalls + 4 washbasin cabinets block.
Various improvements in the sanitary blocks (full lenghth mirrors , more coat-hangers, wooden duckboard for wheelchairs, 24×7 hairdryer access, blue sanitary block has been fitted with rain gutters,the 4 ladies washbasin cabinets have had doors installed ,etc.. )
Creation and installation of an outside signboard
Creation of a concrete terrace. 2 objectives: no longer dancing in the gravel and improved access to the restaurant for wheelchairs
Creation of a wooden floorboard for the country music line dance !
Bedding improvement : follow-up from the last 2 years
Another six 140 cm mattrasses in the gites along with some quilts & pillows will be replaced by brand new ones !
Various small improvements have been brought to the gites :
curtains have neen added in the bedrooms exposed
to the campers’ view, shelves were added in the gites that needed them ,handles for disabled persons have been added
to the disabled dedicated units , etc..
Swimming Pool improvement
A Foot bath (wheelchair compatible) has been built to ensure better swimmers’ hygiene
The shower has also been replaced
Creation of a camping’s postcard
Improved accessibility for PWD’s (wheelchair compatible shower)
Refection of the main building’s roof
Main building’s foundations have been isolated against the rain
Guttering all around the sanitary block nro 2
Redefining the hedges’ foothold to facilitate mowing pitches corners :
And also :